New command
Creates a new empty row in the structure. You have two options for inserting a new empty item into the BOM structure. You can:
You can use the New command when:
-
A single row with data is selected.
Note:The New command is disabled if you have multiple rows selected.
-
The Item Revision does not contain a part or sheet metal document.
For new rows, you can define the properties:
-
Item ID
-
Item Revision
-
Item Name
-
Item Type
-
Folder
© 2021 UDS